
GU10.1018 Ceramic Light Bulb Socket with Long Lead for LED Lighting Fixtures.
Specifications:
1. Optional Color: Beige
2. Approvals: VDE
3. Body Material: Ceramic
4. Contact Material: Brass
5. Fixing Screw: M3
6. Rated Temperature: T250 °C
7. Rated Voltage: 250V
8. Rated Current: 2A
9. Cable Type: 0.5-1.0mm² cables
10. Matched Wire: With Blue & Brown FEP Cable.
Features:
1. Specially designed for LED Downlights, LED Ceiling Lamps, and LED Commercial Lighting.
2. Durable ceramic body with brass contact material.
3. Can withstand temperatures up to T250 °C.
4. Rated for 250V and 2A.
5. Supports 0.5-1.0mm² cables.
6. Comes with matched blue and brown FEP cables.
7. Riveted connection ensures strong bond between socket and wires.
8. Features M3 fixing screw for secure attachment.
Description:
The GU10.1018 Ceramic Light Bulb Socket, beige in color, offers a long-lasting solution for LED Downlights, LED Ceiling Lamps, and LED Commercial Lighting fixtures. Made from sturdy ceramic material with brass contacts, it provides excellent durability. The socket can operate at a maximum temperature of T250 °C, handling a voltage of 250V and a current of 2A.
This socket is designed to support 0.5-1.0mm² cables and comes equipped with matched blue and brown FEP cables. A riveted connection ensures a robust bond between the socket and the wires, and an M3 fixing screw secures the assembly.
Specific Use:
The GU10.1018 Ceramic Light Bulb Socket is intended for use with LED Downlights, LED Ceiling Lamps, LED Commercial Lighting, and other similar lighting appliances.
FAQs:
1. What lighting fixtures is this socket intended for?
This socket is intended for LED Downlights, LED Ceiling Lamps, LED Commercial Lighting and other similar lighting fixtures.
2. What is the body material of this socket?
The socket’s body is made from sturdy ceramic material.
3. What is the maximum temperature this socket can operate at?
The socket can operate at a maximum temperature of T250 °C.
4. What kind of cables does this socket support?
The socket supports 0.5-1.0mm² cables and comes equipped with matched blue and brown FEP cables.
5. How is the socket attached?
The socket features an M3 fixing screw for secure attachment, and the socket and wires are connected through a riveted connection for a robust bond.












